animalstyle
BuSo Pro
- Joined
- Mar 28, 2015
- Messages
- 930
- Likes
- 843
- Degree
- 3
Curious how you guys run your email lists - specifically lists built that are attached to a respectable, branded money site.
Specifically I just went through the process of setting up a system within my email system (ActiveCampaign) that tags each user with a last active date when they open an email or visit my site (any visit, not just clicking site links). I also set up a cleaner that looks for contacts which have last active dates of greater than 120 days. The cleaner tags them and then unsubscribes them.
I was cruising along thinking this was a great idea as it will constantly trim the fat off my list, keeping me from over paying for keeping a bloated list afloat. Then I started wondering if what may happen is I end up trimming people out that are active, but have blocked site/open tracking.
Not being familiar with this territory I thought it would be wise to ask around here and see what you guys do:
Is it worth trimming your list to keep costs down?
Is it a shot in the foot and instead just keep blasting?
If I should be trimming, is 120 days a good target?
Specifically I just went through the process of setting up a system within my email system (ActiveCampaign) that tags each user with a last active date when they open an email or visit my site (any visit, not just clicking site links). I also set up a cleaner that looks for contacts which have last active dates of greater than 120 days. The cleaner tags them and then unsubscribes them.
I was cruising along thinking this was a great idea as it will constantly trim the fat off my list, keeping me from over paying for keeping a bloated list afloat. Then I started wondering if what may happen is I end up trimming people out that are active, but have blocked site/open tracking.
Not being familiar with this territory I thought it would be wise to ask around here and see what you guys do:
Is it worth trimming your list to keep costs down?
Is it a shot in the foot and instead just keep blasting?
If I should be trimming, is 120 days a good target?